Hydropower Challenge

Working with engineers from Mott MacDonald, students design a hydropower station for Georgia.  They explore the geography and geology of the area, examine and design different types of dams and turbines, work out costings and tender for the project.

 

Year 10 students survey the dam at Grafham Water with engineers from Mott MacDonald.

 

 

 

Alicia measures water flows at Babraham Weir.